Project planner
Install flooring
From room measurements to boxes, underlayment, trim and cost. Each room is measured separately and added once, so rounding happens only where it should — on whole boxes.
- 01 Room dimensions
- 02 Floor area
- 03 Waste allowance
- 04 Boxes
- 05 Underlayment & trim
- 06 Cost
- 07 Summary
Step 1: Room dimensions
Measure each room wall to wall. Add closets as their own rooms.
- Total floor area
- 192 sq ft
Step 2: Waste allowance
Pick the layout. More cuts mean more waste.
- Waste allowance
- 10%
- Area to buy for
- 211 sq ft
Step 3: Boxes
Coverage per box is on the label.
Printed on the box label.
- Flooring boxes220 sq ft total
- 11 boxes
- Spare after install
- 28 sq ft
Step 4: Underlayment & trim
The parts people forget until the second trip to the store.
Strips where the new floor meets another floor.
- Underlayment
- 3 rolls
- Quarter-round (8 ft lengths)58 ft
- 8 lengths
- Transition strips
- 1 strip
Step 5: Cost
Use the prices on the shelf tag or quote.
per sq ftper rollper ftper strip- Flooring
- $770.00
- Underlayment
- $90.00
- Trim
- $69.96
- Transitions
- $25.00
- Estimated material cost
- $954.96
MeasureToBuy · project summary
Flooring project estimate
Buy 11 boxes of flooring.
Measurements
- Living room: length 16 ft, width 12 ft
- Coverage per box: 20 sq ft
- Underlayment: Yes
- Quarter-round trim: Yes
- Doorway transitions: 1
- Flooring priced: Per sq ft / m²
Key figures
- Total floor area
- 192 sq ft
- Waste allowance
- 10%
- Area to buy for
- 211 sq ft
Shopping list
- Flooring boxes220 sq ft total
- 11 boxes
- Underlayment
- 3 rolls
- Quarter-round (8 ft lengths)58 ft
- 8 lengths
- Transition strips
- 1 strip
Material cost
- Flooring
- $770.00
- Underlayment
- $90.00
- Trim
- $69.96
- Transitions
- $25.00
- Estimated material cost
- $954.96
Calculators provide planning estimates. Actual material requirements vary with product specifications, installation method, site conditions, local codes and project complexity.
Before you start
- Measure every room wall to wall, including closets.
- Check the coverage per box on the product you're considering.
- Plan where the new floor meets other floors — each doorway needs a transition strip.
Questions about this project
Should I remove baseboards before installing flooring?
For the cleanest finish, yes — the new floor runs under the baseboard. Leaving them in place means covering the expansion gap with quarter-round, which this planner can include.
How much flooring should I keep for repairs?
At least one unopened box. Production lots vary and discontinued products are hard to match.
Calculators used in this project
Need just one number? Each step is also a stand-alone calculator.