Material guide
Concrete
Concrete is a volume problem. You buy it by the cubic yard from a ready-mix plant or by the bag at a store, and each bag yields a known fraction of a cubic foot.
Calculators
- Concrete CalculatorCubic yards and bags for slabs, footings, columns and walls.
- Concrete Slab CalculatorSlab volume with thickened edges, gravel base and rebar.
- Concrete Footing CalculatorContinuous footings and pier holes, with rebar.
- Concrete Steps CalculatorStep layout and concrete for poured steps.
- Rebar CalculatorRebar grid bars, laps and weight.
- Concrete Bag CalculatorPremix bags by size, with water and weight.
- Cement CalculatorCement, sand and gravel for a site-mixed batch.
- Cubic Yard CalculatorCubic yards and tons from length × width × depth.
Cost estimators
How concrete is sold
- Cubic yard (27 cu ft)
- How ready-mix is ordered. Trucks carry 8–10 yards; small loads carry a short-load fee.
- 80 lb bag
- Yields about 0.60 cu ft. 45 bags make a cubic yard.
- 60 lb bag
- Yields about 0.45 cu ft. 60 bags make a cubic yard.
- 40 lb bag
- Yields about 0.30 cu ft. 90 bags make a cubic yard.
- Cubic metre
- The metric order unit. 1 m³ ≈ 1.31 cu yd.
Terms on the label
- Ready-mix
- Concrete batched at a plant and delivered in a mixer truck, ordered by the cubic yard.
- Premix
- Bagged cement, sand and gravel — just add water.
- PSI
- Compressive strength. 3,000 psi is common for slabs; 4,000 psi for driveways and freeze-thaw climates.
- Short-load fee
- A surcharge for ready-mix orders under the plant's minimum, often 4–6 yards.
- Slump
- How stiff or fluid the mix is. Higher slump flows more easily but can be weaker if water was added.
Buying tips
- Order 5–10% more than calculated. Running short mid-pour leaves a cold joint.
- Above about one cubic yard, ready-mix is usually cheaper than bags and far less labour.
- Compact a 4 in gravel base under slabs — the base matters as much as the concrete.