Concrete

Concrete is a volume problem. You buy it by the cubic yard from a ready-mix plant or by the bag at a store, and each bag yields a known fraction of a cubic foot.

Calculators

Cost estimators

How concrete is sold

Cubic yard (27 cu ft)
How ready-mix is ordered. Trucks carry 8–10 yards; small loads carry a short-load fee.
80 lb bag
Yields about 0.60 cu ft. 45 bags make a cubic yard.
60 lb bag
Yields about 0.45 cu ft. 60 bags make a cubic yard.
40 lb bag
Yields about 0.30 cu ft. 90 bags make a cubic yard.
Cubic metre
The metric order unit. 1 m³ ≈ 1.31 cu yd.

Terms on the label

Ready-mix
Concrete batched at a plant and delivered in a mixer truck, ordered by the cubic yard.
Premix
Bagged cement, sand and gravel — just add water.
PSI
Compressive strength. 3,000 psi is common for slabs; 4,000 psi for driveways and freeze-thaw climates.
Short-load fee
A surcharge for ready-mix orders under the plant's minimum, often 4–6 yards.
Slump
How stiff or fluid the mix is. Higher slump flows more easily but can be weaker if water was added.

Buying tips

  • Order 5–10% more than calculated. Running short mid-pour leaves a cold joint.
  • Above about one cubic yard, ready-mix is usually cheaper than bags and far less labour.
  • Compact a 4 in gravel base under slabs — the base matters as much as the concrete.