Skip to content
MeasureToBuy

Project planner

Install a fence

Lay out a fence run and get posts, panels or pickets and rails, gates and post-hole concrete — the same numbers as the Fence Calculator, split into steps with a printable list.

  1. 01 Fence layout
  2. 02 Posts & sections
  3. 03 Infill
  4. 04 Post concrete
  5. 05 Cost
  6. 06 Summary
  1. Step 1: Fence layout

    Total length, how many separate runs, height and gates.

    Include the gate openings.

    Count each straight stretch between corners or ends. Each run adds an end post.

    Above ground.

    Opening between gate posts.

  2. Step 2: Posts & sections

    Post spacing sets the section width; panels usually fix it at 8 ft (2.4 m).

    Post spacing

    Standard panels and rails

    Post size

    3½ in actual

    Fence length
    100 ft
    Gate openings1 × 4 ft
    4 ft
    Sections8 ft post spacing
    13 sections
    Posts8 ft long (6 ft + 24 in in the ground)
    15 posts
  3. Step 3: Infill

    Prebuilt panels, or pickets on rails.

    Fence style

    Built on site

    Rails per section

    5–6 ft privacy fences

    A 1×4 picket is 3½ in wide; a 1×6 is 5½ in.

    0 for a privacy fence, 1–2 in for spaced pickets.

    Pickets3.5 in wide, 0 in gap
    330 pickets
    Rails3 per section × 12 sections, 8 ft long
    36 rails
    Gates
    1 gate
  4. Step 4: Post concrete

    Holes about three times the post width, a third of the height deep.

    0 = automatic: ⅓ of the fence height, at least 24 in (600 mm). Go below the frost line where the ground freezes.

    Concrete bag

    0.375 cu ft per bag

    Hole diameter3 × post width
    10.5 in
    Hole depth⅓ of the height, minimum applied
    24 in
    Concrete per holehole minus the post
    1.03 cu ft
    Concrete for all posts
    15.5 cu ft
    50 lb fast-setting bags0.38 cu ft per bag
    42 bags
  5. Step 5: Cost

    Prices from your supplier.

    per post
    per picket
    per rail
    per bag
    per gate
    Posts
    $270.00
    Pickets
    $990.00
    Rails
    $324.00
    Concrete
    $336.00
    Gates
    $150.00
    Estimated material cost
    $2,070

MeasureToBuy · project summary

Fence project estimate

You need 15 posts and 330 pickets.

Measurements

  • Total fence length: 100 ft
  • Straight runs: 1
  • Fence height: 6 ft
  • Post spacing: 8 ft
  • Fence style: Pickets and rails
  • Picket width: 3.5 in
  • Gap between pickets: 0 in
  • Rails per section: 3
  • Gates: 1
  • Gate width: 4 ft
  • Post size: 4×4
  • Post hole depth: 0 in
  • Concrete bag: 50 lb fast-setting

Key figures

Fence length
100 ft
Gate openings1 × 4 ft
4 ft
Sections8 ft post spacing
13 sections
Posts8 ft long (6 ft + 24 in in the ground)
15 posts

Shopping list

Posts8 ft long (6 ft + 24 in in the ground)
15 posts
Pickets3.5 in wide, 0 in gap
330 pickets
Rails3 per section × 12 sections, 8 ft long
36 rails
Gates
1 gate
50 lb fast-setting bags0.38 cu ft per bag
42 bags
Estimated material cost
$2,070

Material cost

Posts
$270.00
Pickets
$990.00
Rails
$324.00
Concrete
$336.00
Gates
$150.00
Estimated material cost
$2,070

Posts = 13 sections + 1 for the run end + 1 so each gate has its own hinge and latch post. Set gate posts deeper or use 6×6 posts — a swinging gate pulls harder on its post than any fence section. Hardware, nails or screws, gravel under the posts and post caps are not included. Buy 5% extra pickets for splits and knots. Height limits, setbacks, property lines and permits vary by town and HOA. Call 811 (or your local utility locator) before digging.

Calculators provide planning estimates. Actual material requirements vary with product specifications, installation method, site conditions, local codes and project complexity.

Before you start

  • Confirm the property line, height limits and any HOA rules before you order.
  • Mark gate positions first — each gate needs its own strong posts.
  • Call 811 (or your local utility locator) before digging post holes.

Questions about this project

How deep should fence posts be?

A common rule is one third of the post height above ground, at least 24 in, and below the frost line where it freezes.

Panels or pickets?

Prebuilt panels are faster and fix the post spacing; pickets on rails follow slopes and curves better and let you choose the gap.

Calculators used in this project